VI. OPERATIONS IN N.-E. BURMA.
29. Early in 1942 the construction of a road from Ledo (in North-East Assam) towards Myitkyina in Upper Burma had been begun. Work had been interrupted by the evacuation of Burma and by the monsoon; but had been resumed in November. In December the Americans took over the construction, with the intention of eventually driving a supply route through to China. By June 20 roadhead had crossed the Paungsa Pass, 46 miles from Ledo. The nature of the country and the climate made the work extremely difficult. To protect the construction, the Americans employed a part of the Chinese troops who had been trained in India under American supervision (see paragraphs 15 and 16 of my Despatch on operations in the Eastern Theatre based in India, Mar.- Dec. 1942).*
30. I mentioned in my last Despatch* (paragraph 22) the reoccupation of Fort Hertz in the extreme north of Burma to support the operations of .the Kachin Levies towards Myitkyina. These levies, under Lieut.-Colonel Gamble, did most valuable work in harassing the Japanese forces in the Myitkyina area during the early part of 1943; so much so that they stung the enemy into retaliation. Early in March a considerable Japanese force advanced on Sumprabum, temporarily dispersed the levies, and seemed to threaten Fort Hertz.
There was a moment when it was represented to me that only a brigade could save Fort Hertz. There was no brigade available; the only means of communication with Fort Hertz were by air; and very few transport aircraft were available. I had one additional company flown in to Fort Hertz. The Japanese did not advance beyond Sumprabum and the levies soon recovered their morale.
Notes:
* Published as a Supplement to The London Gazette on the 18th September, 1946. Operations in the Eastern Theatre based in India, Mar.- Dec. 1942
|